Foundation construction of jacket-type wind turbines and simultaneous excavation piles for bedrock.
Introduction to construction methods that can dramatically shorten construction periods and improve safety.
Introducing the "Jacket-Type Wind Turbine and Simultaneous Drilling of Bedrock Piles" construction method. This method significantly shortens the construction period by allowing the simultaneous operation of three or four drilling piles. Additionally, it enables safe evacuation in a short time during inclement weather. Furthermore, it can accommodate the pile driving - in-pile drilling - pile driving method (Drive-Drill-Drive). For more details, please contact us. 【Features】 ■ Significant reduction in construction time by simultaneously operating three or four drilling piles ■ Safe evacuation in a short time during inclement weather ■ Compatible with the pile driving - in-pile drilling - pile driving method (Drive-Drill-Drive) *For more details, please refer to the PDF document or feel free to contact us.
- Company:深田サルベージ建設 東京支社
- Price:Other